Page Title: Campus Masterplan » KLH Sustainability

  • This webpage makes use of the TITLE meta tag - this is good for search engine optimization.

Page Description: Campus Masterplan. Client: BSkyB. KLH Sustainability initially supported BSkyB in translating their strong corporate sustainability agenda into a strategy for their new campus development in Hounslow.

  • This webpage makes use of the DESCRIPTION meta tag - this is good for search engine optimization.

Page Keywords:

  • This webpage DOES NOT make use of the KEYWORDS meta tag - whilst search engines nowadays do not put too much emphasis on this meta tag including them in your website does no harm.

Page Text: Campus Masterplan BSkyB KLH Sustainability provided technical support and assurance to BSkyB in the major redevelopment of their Osterley Campus. Over a period of three years, three buildings were demolished to provide space for over 54,000 sqm of new, media-specific workspace and associated facilities. The new campus is now home to The Hub, a new core executive suite, Sky Academy or the Believe in Better Building and a dedicated Health and Fitness Centre for staff. The heart of the campus, Sky Central, is home to 4,000 employees and contains key facilities for the 7,000 campus staff including post office, hairdresser, dry cleaners and bike shop. Sky Central also houses new recording studios and screening facilities. KLH Sustainability translated BSkyB’s Corporate Sustainability position into a design and construction specific Sustainable Development Strategy, in addition to providing an ambitious Employment and Skills Strategy. Our involvement did not end there; it then fell to us to support the BSkyB Campus Masterplan to deliver against the targets! As a result of our involvement the redevelopment is predicted to deliver a 43% reduction in carbon emissions per m2 of internal floor area for the Osterley Campus by 2020 through the replacement of old buildings, optimisation of the existing District Heating, Cooling and Power plant and extensive photovoltaic provision. In addition, sustainably sourced timber features heavily throughout the campus in structural and architectural forms. The timber construction has demonstrably lowered the embodied carbon of construction and provides a unique workplace environment. - British Council of Offices 2017 – Corporate Workplace Winner for London (for Sky Central) - British Council of Offices 2016 – Commercial Workplace Shortlist (for the Meeting Centre)

  • This webpage has 266 words which is between the recommended minimum of 250 words and the recommended maximum of 2500 words - GOOD WORK.

Header tags:

  • It appears that you are using header tags - this is a GOOD thing!

Spelling errors:

  • This webpage has 3 words which may be misspelt.

Possibly mis-spelt word: KLH

Suggestion: KL
Suggestion: KPH
Suggestion: KWH
Suggestion: KL H

Possibly mis-spelt word: Osterley

Suggestion: Ostler

Possibly mis-spelt word: Masterplan

Suggestion: Master plan
Suggestion: Master-plan
Suggestion: Plasterer

Broken links:

  • This webpage has 30 broken links.

Broken link URL:

http://www.klhsustainability.com/projects/apartments-for-london/
http://www.klhsustainability.com/projects/olympic-stadium-transformation/
http://www.klhsustainability.com/news/
http://www.klhsustainability.com/projects/corporate-strategy-elliott-wood/
http://www.klhsustainability.com/projects/clarion-housing-group/
http://www.klhsustainability.com/team/
http://www.klhsustainability.com/projects/st-jamess-market/
http://www.klhsustainability.com/media/lectures/
http://www.klhsustainability.com/projects/mclaren/
http://www.klhsustainability.com/media/
http://www.klhsustainability.com/projects/carbon-neutral-laboratory/
http://www.klhsustainability.com/projects/
http://www.klhsustainability.com/projects/east-wick-and-sweetwater/
http://www.klhsustainability.com/services-fr-fr/
http://www.klhsustainability.com/services-ru-ru/
http://www.klhsustainability.com/privacy-policy/
http://www.klhsustainability.com/contact/
http://www.klhsustainability.com/projects/campus-masterplan/
http://www.klhsustainability.com/media/case-studies/
http://www.klhsustainability.com/assets/Uploads/Sky-campus-project-sheet-revised.pdf
http://www.klhsustainability.com/assets/Uploads/130906-BskyB-Meeting-Centre-Environment-and-Sustainability-Management-Formated.pdf
http://www.klhsustainability.com/credentials/
http://www.klhsustainability.com/projects/marine-aggregates-research-project/
http://www.klhsustainability.com/projects/east-wick-and-sweetwater/
http://www.klhsustainability.com/services/
http://www.klhsustainability.com/projects/unep-technical-advisor-for-olympic-and-paralympic-games/
http://www.klhsustainability.com/projects/east-wick-and-sweetwater/
http://www.klhsustainability.com/projects/carbon-neutral-laboratory/
http://www.klhsustainability.com/
http://www.klhsustainability.com/services-es-es/

Broken image links:

  • This webpage has 30 broken image links.

CSS over tables for layout?:

  • It appears that this page uses DIVs for layout this is a GOOD thing!

Last modified date:

  • We were unable to detect what date this page was last modified

Images that are being re-sized:

  • This webpage has 2 images that are being re-sized by the browser.

Images that are being re-sized:

  • This webpage has 1 images that do not have their width and height specified.

Mobile friendly:

  • After testing this webpage it appears to be mobile friendly - this is a GOOD thing!

Links with no anchor text:

  • This webpage has 2 links that do not contain anchor text - this is NOT a good thing.

W3C Validation:

Print friendly?:

  • It appears that the webpage does NOT use CSS stylesheets to provide print functionality - this is a BAD thing.

GZIP Compression enabled?:

  • It appears that the serrver does NOT have GZIP Compression enabled - this is a NOT a good thing!