Page Title: St James’s Market » KLH Sustainability

  • This webpage makes use of the TITLE meta tag - this is good for search engine optimization.

Page Description: St James’s Market. Client: Balfour Beatty. KLH Sustainability pitched with Balfour Beatty to secure the construction of a prestigious new development by The Crown Estate in central London.

  • This webpage makes use of the DESCRIPTION meta tag - this is good for search engine optimization.

Page Keywords:

  • This webpage DOES NOT make use of the KEYWORDS meta tag - whilst search engines nowadays do not put too much emphasis on this meta tag including them in your website does no harm.

Page Text: St James’s Market Balfour Beatty KLH Sustainability pitched with Balfour Beatty to secure the construction of a prestigious new development by The Crown Estate in central London. We developed a philosophy of ‘closing the loop’ which appealed to The Crown Estate’s status as land owner and developer. The philosophy has seen the installation of a stone façade quarried in Portland and frame-fitted in Ealing, internal FSC hardwood panelling from the Windsor Estate, kiln dried in Grantham, and fabricated in Essex and marine aggregates dredged from the Thames Estuary, landed in Greenwich prior to being barged up river to the concrete batching facility in Battersea. The project achieved 'Excellent' BREEAM certificate scores in both design stage (76% for Regent's Street Block and 77.8% for Haymarket Block) and construction stage (74.6% for Regent's Street Block and 72.5% for Haymarket Block.) In our role as Project Sustainability Manager, we are proud to have played an active role in the project achieving Considerate Constructors Scheme Gold Award for two years running, and in achieving finalist status in the Constructing Excellence London and South East Awards. - Considerate Constructors Scheme 2016 – National Site Gold Award Winner - Constructing Excellence in London & South East Awards 2016 – Sustainability Finalist - Best Commercial Development - Props Award 2017

  • This webpage has 206 words which is NOT between the recommended minimum of 250 words and the recommended maximum of 2500 words.

Header tags:

  • It appears that you are using header tags - this is a GOOD thing!

Spelling errors:

  • This webpage has 4 words which may be misspelt.

Possibly mis-spelt word: Beatty

Suggestion: Betty
Suggestion: Be atty
Suggestion: Be-atty
Suggestion: Bratty
Suggestion: Batty
Suggestion: Beauty
Suggestion: Beat

Possibly mis-spelt word: Grantham

Suggestion: Grant ham
Suggestion: Grant-ham
Suggestion: Amaranth
Suggestion: Graham

Possibly mis-spelt word: KLH

Suggestion: KL
Suggestion: KPH
Suggestion: KWH
Suggestion: KL H

Possibly mis-spelt word: Battersea

Suggestion: Batter sea
Suggestion: Batter-sea
Suggestion: Batters ea
Suggestion: Batters-ea
Suggestion: Batterer
Suggestion: Batter

Broken links:

  • This webpage has 27 broken links.

Broken link URL:

http://www.klhsustainability.com/
http://www.klhsustainability.com/projects/corporate-strategy-elliott-wood/
http://www.klhsustainability.com/projects/marine-aggregates-research-project/
http://www.klhsustainability.com/projects/carbon-neutral-laboratory/
http://www.klhsustainability.com/projects/apartments-for-london/
http://www.klhsustainability.com/projects/clarion-housing-group/
http://www.klhsustainability.com/projects/mclaren/
http://www.klhsustainability.com/projects/st-jamess-market/
http://www.klhsustainability.com/contact/
http://www.klhsustainability.com/team/
http://www.klhsustainability.com/media/publications/
http://www.klhsustainability.com/projects/east-wick-and-sweetwater/
http://www.klhsustainability.com/media/lectures/
http://www.klhsustainability.com/projects/campus-masterplan/
http://www.klhsustainability.com/projects/carbon-neutral-laboratory/
http://www.klhsustainability.com/services-fr-fr/
http://www.klhsustainability.com/services/
http://www.klhsustainability.com/media/
http://www.klhsustainability.com/projects/carbon-neutral-laboratory/
http://www.klhsustainability.com/projects/unep-technical-advisor-for-olympic-and-paralympic-games/
http://www.klhsustainability.com/projects/
http://www.klhsustainability.com/projects/olympic-stadium-transformation/
http://www.klhsustainability.com/services-es-es/
http://www.klhsustainability.com/assets/Uploads/d2e09c4783/St-james-market-project-sheet-revised2-v2.pdf
http://www.klhsustainability.com/projects/gs8/
http://www.klhsustainability.com/privacy-policy/
http://www.klhsustainability.com/services-ru-ru/

Broken image links:

  • This webpage has no broken image links that we can detect - GOOD WORK.

CSS over tables for layout?:

  • It appears that this page uses DIVs for layout this is a GOOD thing!

Last modified date:

  • We were unable to detect what date this page was last modified

Images that are being re-sized:

  • This webpage has 2 images that are being re-sized by the browser.

Images that are being re-sized:

  • This webpage has 1 images that do not have their width and height specified.

Mobile friendly:

  • After testing this webpage it appears to be mobile friendly - this is a GOOD thing!

Links with no anchor text:

  • This webpage has 2 links that do not contain anchor text - this is NOT a good thing.

W3C Validation:

Print friendly?:

  • It appears that the webpage does NOT use CSS stylesheets to provide print functionality - this is a BAD thing.

GZIP Compression enabled?:

  • It appears that the serrver does NOT have GZIP Compression enabled - this is a NOT a good thing!