Page Text: BACK Abbey Wood Station Public Realm  |  Crossrail The Elizabeth Line (formerly know as Crossrail) will open to the public in 2018. Urban Movement have been working on the design of the public realm at Abbey Wood since 2010 within a project team that includes the station architects Fereday Pollard, officers from Bexley and Greenwich Councils and the Crossrail Urban Realm Team. The conceptual and detailed designs were guided by a wider neighbourhood strategy developed by the Urban Movement team whilst working at Urban Initiatives. The design integrates the new station building into the existing and evolving townscape with a new public realm that prioritises the pedestrian and cyclist, whilst maintaining and civilising vehicle access and through-traffic. Strategically, the public realm provides legible links from the station to public transport (buses and taxis) and provides new walking and cycling infrastructure that connects into the local networks. At street level, on Felixstowe and Gayton Roads, the design will reinforce the existing ‘village’ character with trees, shrub planting and seats using traditional streetscape materials of yorkstone paving slabs, granite setts and kerbs. The carriageways are surfaced in concrete setts to help a create a visual unity to the spaces. The materials and details reference the adjacent public realm projects at Cross Quarter and Wilton Road, which both extend the ‘village’ centre north and south of the station, respectively. Public ‘plazas’ are provided at the station entrances with seating, cycle parking and wayfinding information. At the upper level, accessed off the Harrow Manorway flyover, the main station entrance will face a forecourt surfaced in a mix of granite ‘planks’ (long, narrow slabs). This simple grey palette references the brutalism of the flyover structure and totem sign with their exposed aggregate concrete finishes. The proposals for Gayton and Felixstowe Roads are broadly similar as they function in the same way. The streetscape is detailed to prioritise pedestrians and cyclists by slowing vehicles down with narrow carriageways and tight corners. Taxi ranks along with space for drop off/pick up activity, short stay parking and loading bays are all provided in raised footway bays. Generous ‘flush’ crossing areas are provided in front of the station entrances, on the main pedestrian routes. Harrow Manorway has been redesigned to incorporate footways on both sides along with cycle lanes, bus lanes and a general traffic lane in both directions. A wide ‘Toucan’ crossing sits directly opposite the station entrance and separates the two bus stops. The carriageway through this section will be surfaced in coloured asphalt `imprinted’ with a pattern to match the granite slabs used on the forecourt and footways, to visually unify the space. Two new bus shelters have been designed by the station architect to match the language of the new station building with. These will protect several seats, with backs and arms rests, space for wheel chairs and ample standing room. With an anticipated high demand for cycle parking, stands are distributed throughout the public realm to serve the local amenities with bigger concentrations, aimed at station users, in a ‘hub’ under the flyover on the north side. The existing bus shelter, on the eastern side of the flyover, will be retained and refurbished as a new cycle shelter with double height racks to maximise capacity. ​ The current value of the urban realm project is estimated at £2.5million and is due to complete in 2019, after the station becomes operational. Copyright 2022

  • This webpage has 557 words which is between the recommended minimum of 250 words and the recommended maximum of 2500 words - GOOD WORK.

Header tags:

  • It appears that you are using header tags - this is a GOOD thing!

Spelling errors:

  • This webpage has 2 words which may be misspelt.

Possibly mis-spelt word: Crossrail

Suggestion: Cross rail
Suggestion: Cross-rail
Suggestion: Crossroads

Possibly mis-spelt word: centre

Suggestion: center
Suggestion: cent re
Suggestion: cent-re
Suggestion: recent
Suggestion: entrench
Suggestion: entree
Suggestion: crescent

Broken links:

  • This webpage has no broken links that we can detect - GOOD WORK.

Broken image links:

  • This webpage has no broken image links that we can detect - GOOD WORK.

CSS over tables for layout?:

  • It appears that this page uses DIVs for layout this is a GOOD thing!

Last modified date:

  • We were unable to detect what date this page was last modified

Images that are being re-sized:

  • This webpage has no images that are being re-sized by the browser - GOOD WORK.

Images that are being re-sized:

  • This webpage has 1 images that do not have their width and height specified.

Mobile friendly:

  • After testing this webpage it appears to be mobile friendly - this is a GOOD thing!

Links with no anchor text:

  • This webpage has no links that are missing anchor text - GOOD WORK.

W3C Validation:

Print friendly?:

  • It appears that the webpage does NOT use CSS stylesheets to provide print functionality - this is a BAD thing.

GZIP Compression enabled?:

  • It appears that the serrver does NOT have GZIP Compression enabled - this is a NOT a good thing!