Page Title: What are we missing thanks to the Western Distributor? | Public Transport Users Association (Victoria, Australia)

  • This webpage makes use of the TITLE meta tag - this is good for search engine optimization.

Page Description:

  • This webpage DOES NOT make use of the DESCRIPTION meta tag - this is NOT GOOD for search engine optimization.

Page Keywords:

  • This webpage DOES NOT make use of the KEYWORDS meta tag - whilst search engines nowadays do not put too much emphasis on this meta tag including them in your website does no harm.

Page Text: What are we missing thanks to the Western Distributor? What are we missing thanks to the Western Distributor? The State Government is pushing Transurban’s Western Distributor tollway, a massive $10 billion road through Melbourne’s inner west. The taxpayer contribution to this road is set to be at least $1.6 billion, with the rest paid for by allowing Transurban to levy additional tolls on road users for decades to come. It’s billed as a road to get big trucks out of our residential streets. Yet unlike the original West Gate Distributor proposed before the election, it doesn’t directly address this issue. Instead, it’s planned to run directly into the city centre, encouraging an extra 5,000 cars an hour into central Melbourne and boosting Transurban’s already swollen bank account at the expense of more cost-effective, congestion-busting alternatives. There is no requirement for trucks to use the road, and they will pay heavily to do so. What could our government be doing with $1.6 billion instead of building another destructive inner-urban tollroad that won’t solve our traffic problem? Here are some ideas, free of charge. Build the Port Rail Shuttle and develop the inland ports, as already planned and (notionally) funded, to get freight on environmentally friendly rail where viable to do so, and cut toxic diesel pollution in the inner west. Run trains every 10 minutes on all lines through the western suburbs, all day every day. In many cases this can be done without infrastructure upgrades and using existing rolling stock. The main new work required is partial duplication of the Altona Loop, but this should not delay improvements on other lines. Bring forward rail electrification to Caroline Springs and Melton, to be done alongside duplication now proceeding. Build the short connecting track from Werribee to Wyndham Vale planned as part of the original Regional Rail Link scope, to re-establish a connection between Geelong and Werribee train services. Identify and roll out a new network of Smartbus services running every 10 minutes during the day, 7 days a week. This should include the current 903 service, the ‘blue orbital’ from St Kilda to Footscray incorporating existing routes 504 and 246, and also the ‘missing’ portion of route 902 between Airport West and Werribee. Extend tram route 57 from West Maribyrnong to Milleara Mall via Avondale Heights, providing interchange with the 903 Smartbus. Develop targeted road network solutions in consultation with the community to get large trucks off residential streets. This may include some version of Sir Rod Eddington’s Truck Action Plan Stage 1 (but not so as to degrade the Stony Creek or Don McLean Reserves) and/or establishing truck priority lanes on some of the half-dozen existing river crossings in the west. Restrict articulated trucks to a declared network of motorways and non-residential arterial roads. Ensure all road widening projects in growth areas include provision of full time bus lanes, and a commitment to provision of bus service every 10 minutes along the road in question. Fully fund the implementation of the Principal Bicycle Network in the western suburbs. We could make a solid start on all the above—or we could have more of the same traffic snarls and pollution with the Western Distributor. It’s our choice. If you’re in favour of a sensible transport alternative, get involved! Phone or visit your local MP (you can find out who they are at www.parliament.vic.gov.au ) and donate or get involved with the Sustainable Cities Campaign . The public transport advocacy group for Victoria, Australia Follow us on Twitter

  • This webpage has 569 words which is between the recommended minimum of 250 words and the recommended maximum of 2500 words - GOOD WORK.

Header tags:

  • It appears that you are using header tags - this is a GOOD thing!

Spelling errors:

  • This webpage has 1 words which may be misspelt.

Possibly mis-spelt word: Smartbus

Suggestion: Smart bus
Suggestion: Smart-bus
Suggestion: Smarts

Broken links:

  • This webpage has 6 broken links.

Broken image links:

  • This webpage has no broken image links that we can detect - GOOD WORK.

CSS over tables for layout?:

  • It appears that this page uses DIVs for layout this is a GOOD thing!

Last modified date:

  • We were unable to detect what date this page was last modified

Images that are being re-sized:

  • This webpage has 1 images that are being re-sized by the browser.

Images that are being re-sized:

  • This webpage has no images that are missing their width and height - GOOD WORK.

Mobile friendly:

  • After testing this webpage it appears to be mobile friendly - this is a GOOD thing!

Links with no anchor text:

  • This webpage has no links that are missing anchor text - GOOD WORK.

W3C Validation:

Print friendly?:

  • It appears that the webpage does NOT use CSS stylesheets to provide print functionality - this is a BAD thing.

GZIP Compression enabled?:

  • It appears that the serrver does NOT have GZIP Compression enabled - this is a NOT a good thing!