Page Title: Rail Geelong - Locations - Separation Street Bridge

  • This webpage makes use of the TITLE meta tag - this is good for search engine optimization.

Page Description: Rail Geelong - hopefully everything you ever wanted to know about the history of the railways of Geelong and District, and then some.

  • This webpage makes use of the DESCRIPTION meta tag - this is good for search engine optimization.

Page Keywords:

  • This webpage DOES NOT make use of the KEYWORDS meta tag - whilst search engines nowadays do not put too much emphasis on this meta tag including them in your website does no harm.

Page Text: Home » Locations » Separation Street Bridge Separation Street Bridge Track Diagram: View The road bridge at Separation Street was one of two over bridges provided with the opening of the Geelong Line. (the other was at Church Street) On the opening day it was the site of a fatal accident, with Henry Walters (superintendent of locomotives for the Geelong and Melbourne Railway Company) mortally injured after making contact with the bridge while on board the first Melbourne bound train. The original bridge was built between 1857 and 1858 by the Geelong and Melbourne Railway Company, by their engineer Edward Snell. This bridge was replaced with an iron bridge completed in 1875, with the iron girders produced by Geelong's Humble and Company's foundry. In 1959 the Grain Loop was constructed underneath the main Geelong - Melbourne line, and the North Geelong A to C link was relocated north, resulting in an additional road bridge being provided to the north of the existing road bridge to span the new tracks. In 1961/62 the Country Roads Board had extended the dual carriageways of the Princes Highway south to the bridge, but it was not until 1969 that they were extended south, the current Melbourne-bound bridge opened in 1969, and in 1970 the second bridge was opened for Geelong-bound traffic. The new overpass comprised of four bridges on two carriageways each of 3 lanes, and spanned two underpass roads and approximately ten sets of railway tracks. The new bridges are square to the road centreline at the Melbourne end, and vary up to a skew angle of approximately 60° at the Geelong end. The pier positions were rigidly controlled by the position of the railway tracks, leading to spans varying from 19.5 metres (64 feet) to 32.6 metres (107 feet) long. At the Geelong end of the bridges, the highway is on a 137 metre (450 feet) radius curve, and passes over the Bent Street underpass. To maintain a reasonable appearance for traffic approaching the bridge, each outer girder in this end span is to be shaped to follow the circular curve in plan, and thus keep the deck overhang constant. These curved girders would be unstable when supported at their ends only, and so to make transport and erection easier, the curved girders were required to be fastened to the respective adjacent straight girders at the fabrication stage, by having the crossframes between the girders welded on in the shop. The weights of the assemblies are approximately 8.1 to 16.3 tonnes. Each bridge has a narrow and unprotected footpath along the outer edge for pedestrians, and is located on a 'S' curve. The edge balustrades are all metal, and have been damaged multiple times by cars running out of control. In 2008 a drunk driver ran through the balustrade of the Melbourne bound bridge with their car landing onto the railway tracks below. In 2011 another motorist drove their car off the Geelong bound bridge, again landing on the tracks below. In 2008 the southern footpath was closed, with concrete barriers placed along the footpath in an effort to prevent any more cars falling off the bridge onto the railway line. This was followed in 2010 by $3.2 million in funding for the replacement of the Melbourne bound steel balustrades by a concrete wall, and in 2020 by $4.2 million in funding to upgrade the Geelong bound lanes. Photos

  • This webpage has 557 words which is between the recommended minimum of 250 words and the recommended maximum of 2500 words - GOOD WORK.

Header tags:

  • It appears that you are using header tags - this is a GOOD thing!

Your header tags:

Spelling errors:

  • This webpage has 1 words which may be misspelt.

Possibly mis-spelt word: Geelong

Suggestion: Gee long
Suggestion: Gee-long
Suggestion: Erelong
Suggestion: Belong
Suggestion: Longer
Suggestion: Angelo

Broken links:

  • This webpage has no broken links that we can detect - GOOD WORK.

Broken image links:

  • This webpage has no broken image links that we can detect - GOOD WORK.

CSS over tables for layout?:

  • It appears that this page uses DIVs for layout this is a GOOD thing!

Last modified date:

  • It appears that this page was updated on the Friday, January 14, 2022 which is NOT within the last thirty days - this is NOT a good thing!

Images that are being re-sized:

  • This webpage has no images that are being re-sized by the browser - GOOD WORK.

Images that are being re-sized:

  • This webpage has no images that are missing their width and height - GOOD WORK.

Mobile friendly:

  • After testing this webpage it appears to be mobile friendly - this is a GOOD thing!

Links with no anchor text:

  • This webpage has no links that are missing anchor text - GOOD WORK.

W3C Validation:

Print friendly?:

  • It appears that the webpage does NOT use CSS stylesheets to provide print functionality - this is a BAD thing.

GZIP Compression enabled?:

  • It appears that the serrver does NOT have GZIP Compression enabled - this is a NOT a good thing!