Page Title: With an SLS slip looming, one senator wants to keep NASA’s budget “on track” « Space Politics

  • This webpage makes use of the TITLE meta tag - this is good for search engine optimization.

Page Description:

  • This webpage DOES NOT make use of the DESCRIPTION meta tag - this is NOT GOOD for search engine optimization.

Page Keywords:

  • This webpage DOES NOT make use of the KEYWORDS meta tag - whilst search engines nowadays do not put too much emphasis on this meta tag including them in your website does no harm.

Page Text: With an SLS slip looming, one senator wants to keep NASA’s budget “on track” By Jeff Foust on 2014 August 27 at 8:18 pm ET An announcement Wednesday by NASA that the first launch of the agency’s Space Launch System (SLS) heavy-lift rocket could slip by nearly a year has led one key senator to suggest the program needs some budgetary help. NASA announced Wednesday that the SLS passed its Key Decision Point C (KDP-C) review , an assessment of the program’s technical and programmatic progress. The result of the review was an estimate of the program’s development cost ($7.021 billion from February 2014 to first launch). It also provided an estimate of when SLS would be ready for its first launch: no later than November, 2018. That’s nearly a year later than the currently scheduled date of that first launch, designated EM-1, of December 2017. In a teleconference with reporters Wednesday afternoon, NASA officials tried to emphasize that the November 2018 date was not a firm launch date, but instead the result of the 70-percent joint confidence level model used for the review. . “If we don’t do anything, we basically have a 70-percent chance of getting to that date,” said Bill Gerstenmaier, NASA associate administrator for human exploration and operations, adding that he was pushing his team to have SLS ready before then. “We will be there by November of 2018, but I look to my team to do better than that.” However, he also admitted it was unlikely the SLS would be ready in December 2017 as previously planned. “It’s probably sometime in the 2018 timeframe,” he said, “but we don’t want to get too specific now.” NASA will have a better handle on the launch date for the EM-1 mission after completing KDP-C reviews for SLS ground systems later this year and Orion early next year. SLS had been on a roller coaster in recent months. In July, a report by the Government Accountability Office (GAO) warned of cost and schedule risks because of insufficient funding that could delay the EM-1 launch by six months. Earlier this month, though, SLS program manager Todd May said the GAO report was based on “obsolete” funding data and that the program had several months of slack on its critical path. Part of May’s comments were based on additional funding Congress provided to SLS for the current fiscal year and House and Senate appropriations bills fiscal year 2015 that would also increase SLS funding above the administration’s request. But with the potential for a slip in the SLS program, could some members seek more funding for the program? One senator thinks that, at the very least, the program’s current funding needs to be protected. “Technically things look good,” said Sen. Bill Nelson (D-FL), in a statement provided by his office late Wednesday. “But we need to keep the budget on track so NASA can meet an earlier readiness date – which I think can be done.”

  • This webpage has 488 words which is between the recommended minimum of 250 words and the recommended maximum of 2500 words - GOOD WORK.

Header tags:

  • It appears that you are using header tags - this is a GOOD thing!

Spelling errors:

  • This webpage has 2 words which may be misspelt.

Possibly mis-spelt word: SLS

Suggestion: LS
Suggestion: SOLS
Suggestion: SIS
Suggestion: SLY
Suggestion: S LS
Suggestion: SOS
Suggestion: S'S

Possibly mis-spelt word: Foust

Suggestion: Oust
Suggestion: Faust
Suggestion: Roust
Suggestion: F oust
Suggestion: Foist
Suggestion: Fount

Broken links:

  • This webpage has 3 broken links.

Broken image links:

  • This webpage has no broken image links that we can detect - GOOD WORK.

CSS over tables for layout?:

  • It appears that this page uses DIVs for layout this is a GOOD thing!

Last modified date:

  • We were unable to detect what date this page was last modified

Images that are being re-sized:

  • This webpage has no images that are being re-sized by the browser - GOOD WORK.

Images that are being re-sized:

  • This webpage has 2 images that do not have their width and height specified.

Mobile friendly:

  • After testing this webpage it appears to be mobile friendly - this is a GOOD thing!

Links with no anchor text:

  • This webpage has no links that are missing anchor text - GOOD WORK.

W3C Validation:

Print friendly?:

  • It appears that the webpage does NOT use CSS stylesheets to provide print functionality - this is a BAD thing.

GZIP Compression enabled?:

  • It appears that the serrver does NOT have GZIP Compression enabled - this is a NOT a good thing!